
WEG Mexico
A 2.1 million euro investment, a 32% increase in profits, and molds that always end up in the right place.
WEG entrusted us with automating the internal logistics of its new distribution center in Mexico: a high-capacity warehouse built in the smallest possible space, directly connected to production.
Huge molds, minimal space, zero margin for error.
WEG had one of those problems that can’t be solved simply by adding more square meters: bulky molds that required a lot of storage space, and the need to control every movement within the warehouse down to the millimeter.

WEG Mexico
WEG is a Brazilian multinational manufacturer of machinery and equipment, offering solutions in electric machinery, automation, and coatings. The project was carried out at its plant in Mexico City, which manufactures motors, generators, and medium- and low-voltage control panels and automation systems.
The Challenge
The real challenge wasn't just storage, but doing it right: WEG needed a high-capacity automated warehouse in a minimal amount of space, with precise control over material inflows and outflows. And there was one detail that was far from trivial: the molds had to remain in the optimal position at all times—a critical factor for the subsequent stages of the motor manufacturing process.

Bulky molds, minimal space

Full integration with production
The solution
from ULMA
We designed a system intended to support WEG’s entire logistics chain: production, vertical molding line, horizontal molding line, and inventory—all interconnected.
At the heart of the facility is an automated warehouse equipped with a double-deck Unit Load pallet stacker crane, connected directly to the production line. Surrounding it is an automated conveyor system that links the central machines to the vertical warehouse, as well as the molding machines—both vertical and horizontal—to that same warehouse.
The result
The resulting system consumes little energy, makes the most of the available space, and gives WEG much finer control over production. And since business never stops, we designed it with an eye toward the future: a flexible design ready for expansion, which also significantly improved working conditions for the operators.
Testimonial
"Automation is a priority for WEG because it allows us to reduce operating costs and keep our processes up to date to drive our business forward,"
José Francisco Morales Rodríguez
Director of Production
"We decided to go with ULMA because of its technical expertise and experience with these types of solutions, and it is the best solution tailored to our business."
"Our goal is to achieve maximum efficiency in the storage and production of molds, while minimizing logistical errors. ULMA's years of experience have been key to our decision to invest in this smart warehouse; their expertise gives us greater confidence in making this investment."
"This solution keeps the molds in the correct position so they can be used in later stages of the process."



